Skip to content
CARBON.TJ

Platform / Registry

Carbon Unit Registry

Every tonne of CO₂ removed is tracked from issuance to retirement. Built to the requirements of Article 6 of the Paris Agreement, the ICVCM principles and the CORSIA criteria

In development · launch after the first pilot verification

Role of the registry

A unit exists only as a record in the registry

A carbon unit is not a paper certificate but a registry record: one unit equals one tonne of CO₂ removed from the atmosphere and confirmed by an independent verifier. The registry knows who holds each unit and prevents the same tonne from being issued, sold or claimed twice.

Removal units are issued by the registry of an international standard after an audit. The CARBON.TJ regional registry mirrors them, links them to MRV data for each biochar batch and keeps the records Tajikistan needs for Article 6: authorisation, first transfer and corresponding adjustments.

International practice

What standards require from a registry

Common requirements of the ICVCM principles (Tracking, Transparency, No double counting), the CORSIA criteria and UN decisions on Article 6 of the Paris Agreement

  • ICVCM · CORSIA

    Unique serial number

    Each unit is identified individually: country, project, removal type, vintage and number range

  • ICVCM · CORSIA

    Full life cycle

    Issuance, transfer, retirement and cancellation are recorded for every unit

  • ICVCM

    Open data

    Projects, documents, issuances and retirements are open to everyone, no sign-up needed

  • ICVCM · CORSIA · Article 6

    No double counting

    The same tonne cannot be issued twice, used twice or claimed twice

  • Article 6.2

    Authorisation and adjustments

    Every unit carries authorisation, first-transfer and corresponding-adjustment labels

  • CAD Trust

    Data compatibility

    A data model compatible with the metadata of international registries, plus an open API

Life cycle

A unit's path through the registry

  1. Project registration

    Description, methodology, project boundaries and documents are published before issuance

  2. Verification

    An independent body (VVB) checks the MRV data for the reporting period

  3. Issuance

    Units receive serial numbers and are credited to the project account

  4. Transfer

    Units move to the buyer's account. The first international transfer is the Article 6 trigger

  5. Retirement

    The unit is permanently taken out of circulation, with the beneficiary, purpose and claim period recorded

Cancellation is a separate operation: the unit is taken out of circulation without a reduction claim, for example for corrections or into the buffer reserve.

Serial number

What a serial number is made of

Proposed format. The final one is agreed with the certification standard.

What a serial number is made of
SegmentExampleMeaning
CountryTJCountry of origin, ISO 3166
RegistryCTJCARBON.TJ regional registry
TypeBCCO₂ removal with biochar
ProjectP001Project ID in the registry
Vintage2027Year in which the CO₂ was removed
BatchB0001Biochar batch in the MRV log
Range000001–000250Unit numbers in the issued block

Sample number: TJ-CTJ-BC-P001-2027-B0001-000001-000250. The unit's number in the standard's registry is stored alongside it for reconciliation.

Data

What the registry stores for each unit

What the registry stores for each unit
FieldPublicWhy
Project and methodologyYesWhere the unit comes from and which rules were used to calculate it
Vintage and removal typeYesYear of removal and method: biochar, durable carbon storage
DurabilityYesCarbon storage horizon under the methodology
Verifier and reportYesWho confirmed the volume and on what data
Number in the standard's registryYesReconciliation with the international registry
StatusYesActive, retired, cancelled, in buffer or blocked
Article 6 labelsYesAuthorisation, first transfer, corresponding adjustment
Eligibility labelsYesFor example, CORSIA eligibility, if granted
Account holderNoPersonal data is visible only to the operator and the regulator
Retirement beneficiaryWith consentOn whose behalf the removal is claimed

Statuses

Unit statuses

Unit statuses
StatusMeaningTransferable
ActiveIssued and held in a project or buyer accountYes
RetiredTaken out of circulation; the removal is claimed by a beneficiaryNo
CancelledTaken out of circulation without a claim, for corrections and fixesNo
In bufferReserve against reversal, if the methodology requires oneNo
BlockedTemporarily, during a review or disputeNo

Accounts

Account types

Structure modelled on the registries of international standards and the Article 6.4 mechanism registry

  • Project account

    Units arrive here after verification and issuance

  • Holding account

    For buyers, traders and investors. Opened after a customer check (KYC)

  • Retirement account

    Units are retired here with the beneficiary, purpose and period stated

  • Cancellation account

    Units are withdrawn without a claim, for corrections and fixes

  • Buffer account

    Reserve against reversal, if the methodology requires one

  • Government account

    Records of authorised units and corresponding adjustments for Article 6

Article 6

Ready for Article 6 of the Paris Agreement

Under UN decisions 2/CMA.3 and 6/CMA.4 on Article 6.2

  1. 01

    Authorisation

    Tajikistan's designated authority permits units to be used by another country or for international purposes. The registry applies an authorisation label

  2. 02

    First transfer

    The first international transfer of an authorised unit is the point at which Tajikistan makes a corresponding adjustment

  3. 03

    Corresponding adjustment

    The tonne is deducted from Tajikistan's balance so that it is not counted twice, by the country and by the buyer

  4. 04

    Reporting

    Data for the country's Article 6 reports and for the UN international registry, in the agreed electronic format (AEF)

Compliance

Compliance map

Compliance map
RequirementSourceHow CARBON.TJ meets itStatus
Unique identification of unitsICVCM Tracking, CORSIASerial numbers linked to the number in the standard's registryIn development
Recording of issuance, transfer, retirementICVCM, CORSIATransaction log for every unitIn development
Public accessICVCM TransparencyOpen showcase and APIIn development
No double issuance, use or claimingICVCM, CORSIA, Article 6Reconciliation with the standard's registry, immutable logIn development
Authorisation and first transferDecisions 2/CMA.3, 6/CMA.4Registry labels, data exchange with the designated authorityPlanned
Metadata compatibilityCAD TrustData model and exportPlanned
Data and access protectionRegistry practiceRoles, two-factor sign-in, audit log, servers in TajikistanIn development

The registry has not launched yet. Statuses are updated as development progresses.

Security

How records are protected

  • Immutable log

    Operations are written to a permissioned blockchain, so history cannot be quietly altered

  • Customer checks

    Holding accounts are opened after KYC

  • Roles and two-factor sign-in

    Every action is taken by a specific user with their own permissions

  • Data in Tajikistan

    Servers and personal data stay in the country

Showcase

List of units (sample)

This is how the public showcase will look. The data below is a sample, not real units.

List of units (sample)
Serial numberProjectVintageVolume, t CO₂Status
SAMPLE-0001…0100Sample: biochar, Sughd——Sample
SAMPLE-0101…0150Sample: biochar, Khatlon——Sample

Real data will appear after the first units are issued.

Questions

Registry FAQ

Who issues the units: CARBON.TJ or the international standard?

Removal units are issued by the registry of the standard under which the project is certified. CARBON.TJ mirrors them with the same volume and number and adds MRV data and Article 6 labels. A tonne is never issued in two registries.

What does the buyer get on retirement?

A public retirement record: serial numbers, beneficiary, purpose and claim period, plus a confirmation linking to that record.

How is retirement different from cancellation?

Retirement is a claim: the tonne is credited to the beneficiary. Cancellation takes a unit out of circulation without a claim, for example to fix an error or move it to the buffer reserve.

Why does a buyer need a corresponding adjustment?

Without it, the same tonne could be counted both by Tajikistan towards its climate targets and by the buyer. An adjustment is needed when a unit is used by another country, under CORSIA or for other international purposes.

When will the first units appear?

After the first pilot verification. Timing is in the pilot roadmap.

Launch

Get notified when the registry launches